It's been rainy, muddy, and messy since our last report, "Teardown Week 4." The building inspectors came, the erosion control inspectors came. Did I mention the rain? Finally it dried up. The architect, the supervisor, the surveyor, the grader arrived to figure out how exactly where and how deep to dig the hole.

I think the elevation of the basement is about 888' above sea level.

Here it was:
P9100865-AxlR-NorthFacade-From-Street

Here it is today. Lots of good Georgia clay:
PA201307-1261-2009-10-20-BasementLevel

PA201308-1261-2009-10-20-BasementLevel

Here is the whole sequence so far.



Thanks,
Terry